You are provided with the following information regarding a system that has been designed by your company of engineers:

  • Failure rate LaTeX: lambda ? ” style=”max-width: 794px;”> ? =0.001
  • Total operation time=20,000 hours
  • MDT=Mean downtime = 72 hours
  • Total number of maintenance incidents = 100
  • Mean preventive maintenance time = 5 hours
  • Mean logistic plus administrative time =48 hours

Estimate the following values:

A sub i, a sub a, a sub o, mct with a bar above, mtbm, mtbf, m with a bar above.