The Attached Is The Information Those Are The Things Need To Be Done Each Group Subm 2713022

The attached is the information. Those are the things need to be done: Each group submits a written bid strategy and a budget, and bids on the first round of jobs (using forms on pages 25 and 28). The first round of jobs offered are on page 23.
The administrator receives bids and awards jobs. The second round of jobs offered.
Each group submits bids on the second round. The administrator receives bids and awards jobs.

Attachments:

Graphic–2-.pdf137B-S18-GRAP….pdf

Prof. Angela

4.6/5

Calculate Price


Price (USD)
$